We are commited to be the best
-
We believe we are your best and right partner
-
Build Everything With Passion

About Company
We’re More than a pipe coating Company
- Establishment and operation of onsite coating facilities for line pipe projects
- Strategic partnerships and investment in the provision of professional coating services worldwide
- Custom line pipe coating equipment and its installation, commissioning, and operational training for projects
- Pipeline-related business ventures

What we’re offering
Our service

External Polyethylene Coating

External Asphalt Enamel Coating

Concrete Weight Coating

External Fusion Bonded Epoxy Coating

Mobile Facility
Closed Projects
Explore Our Projects
- Tanzania
- Tangerang & Bogor
- Gresem Pipe Line
- Porong- PLTGU Grati
- Balongan- Mundu
- MMF-LPRO

Tanzania
On September 26, 2011, CPTDC, CPP, and CPE, three subsidiaries of China National Petroleum Corporation (CNPC) jointly signed the EPC contract with Tanzania Petroleum Development Corporation (TPDC) for the construction of Tanzania Mnazi Bay and Songo Songo Natural Gas Processing Plants and Gas Transportation Pipeline Project, a new natural gas pipeline from the natural gas fields in the southeast of Tanzania to Dar es Salaam as well as two gas processing plants, with a total length of 542km.

Tangerang & Bogor
33 Km of 8” pipe was being coated with 3LPE External Coating which was divided into two packages. Package 1 for the Tangerang project and package 3 for the Bogor project for Pertagas Kota. It started on 10 November 2014 and finished on 27 November 2014.

Gresem Pipe Line
48,6 Km Length of 28” OD pipe was being coated for Gresik-Semarang Project for Consortium Wika-Rabana-Kelsri. In accordance with this 5 km was Concrete Weight Coated (CWC).

Porong- PLTGU Grati Pipe Line
30 Km Length of 18” pipe was being coated with 3LPE External Coating of which 1.4 Km was Concrete Weight Coated (CWC) for the Porong – PLTGU Grati, East Java Gas Pipeline Project for Pertagas. It started on 18 March 2015 and finished on 25 March 2015.

Balongan- Mundu Pipe Line
9 Km Length of 12” OD pipe was being coated for Balongan- Mundu project for Pertagas started on 28 November 2014 and finished on 3 December 2014. Another 10 Km was for the same project of 3LPE External Coating which was started on 18 December 2014 and finished on 29 December 2014 in accordance with this 4 Km was being Concrete Weight Coated (CWC).

MMF-LPRO Pipe Line
13 Km of CWC coating for fabrication services for subsea line pipe 16” MMF-LPRO for Pertamina Hulu Energy- ONWJ. It was started in 8 April 2014 and finish in 26 May 2014.
PT. Pipe Coating Indonesia
We Create Big Things with Big Ideas
Our team can provide a complete managed solution, from inbound freight to outbound coated product. We welcome all projects, from 500 feet to 500 miles. PCI Coating will be pleased to serve your next coating requirement.
From The Blog
News & Articles
In November 2017, PT Saka Energi Indonesia, a subsidiary of PT Perusahaan Gas Negara Tbk (IDX:PGAS) unveiled the development of Sidayu Field within Pangkah production sharing contract (PSC) in offshore East Java.
The plan of development (PoD) of the field was approved by the Special Task Force for Upstream Oil and Gas (SKK Migas) in October
Read More
Eni announces the approval of the Plan of Development (POD) for the Merakes field located in the East Sepinggan PSC in the Makassar Strait, offshore East Kalimantan, Indonesia. The Minister of Energy has granted the approval and Mineral Resources of the Republic of Indonesia, just 3 months after the submission of the plan and less
Read More
Indonesia – Oil discovery at Kuda Laut, Tuna Block
Premier is pleased to announce that the Kuda Laut-1 well in Tuna PSC (Premier operator, 65 per cent) offshore Indonesia has discovered 183 feet of net oil-bearing reservoir and 327 feet of net gas-bearing reservoir. Oil and gas samples have been recovered to surface.
Following completion of evaluation
Read More
PT. Pipe Coating Indonesia
Customers & Partners