About Company
We’re More than a pipe coating Company
- Establishment and operation of onsite coating facilities for line pipe projects
- Strategic partnerships and investment in the provision of professional coating services worldwide
- Custom line pipe coating equipment and its installation, commissioning, and operational training for projects
- Pipeline-related business ventures
What we’re offering
Our service
External Polyethylene Coating
External Asphalt Enamel Coating
Concrete Weight Coating
External Fusion Bonded Epoxy Coating
Mobile Facility
Closed Projects
Explore Our Projects
- Tanzania
- Tangerang & Bogor
- Gresem Pipe Line
- Porong- PLTGU Grati
- Balongan- Mundu
- MMF-LPRO
Tanzania
On September 26, 2011, CPTDC, CPP, and CPE, three subsidiaries of China National Petroleum Corporation (CNPC) jointly signed the EPC contract with Tanzania Petroleum Development Corporation (TPDC) for the construction of Tanzania Mnazi Bay and Songo Songo Natural Gas Processing Plants and Gas Transportation Pipeline Project, a new natural gas pipeline from the natural gas fields in the southeast of Tanzania to Dar es Salaam as well as two gas processing plants, with a total length of 542km.
Tangerang & Bogor
33 Km of 8” pipe was being coated with 3LPE External Coating which was divided into two packages. Package 1 for the Tangerang project and package 3 for the Bogor project for Pertagas Kota. It started on 10 November 2014 and finished on 27 November 2014.
Gresem Pipe Line
48,6 Km Length of 28” OD pipe was being coated for Gresik-Semarang Project for Consortium Wika-Rabana-Kelsri. In accordance with this 5 km was Concrete Weight Coated (CWC).
Porong- PLTGU Grati Pipe Line
30 Km Length of 18” pipe was being coated with 3LPE External Coating of which 1.4 Km was Concrete Weight Coated (CWC) for the Porong – PLTGU Grati, East Java Gas Pipeline Project for Pertagas. It started on 18 March 2015 and finished on 25 March 2015.
Balongan- Mundu Pipe Line
9 Km Length of 12” OD pipe was being coated for Balongan- Mundu project for Pertagas started on 28 November 2014 and finished on 3 December 2014. Another 10 Km was for the same project of 3LPE External Coating which was started on 18 December 2014 and finished on 29 December 2014 in accordance with this 4 Km was being Concrete Weight Coated (CWC).
MMF-LPRO Pipe Line
13 Km of CWC coating for fabrication services for subsea line pipe 16” MMF-LPRO for Pertamina Hulu Energy- ONWJ. It was started in 8 April 2014 and finish in 26 May 2014.
PT. Pipe Coating Indonesia
We Create Big Things with Big Ideas
Our team can provide a complete managed solution, from inbound freight to outbound coated product. We welcome all projects, from 500 feet to 500 miles. PCI Coating will be pleased to serve your next coating requirement.
From The Blog
News & Articles
East Africa-focused oil and gas company Wentworth Resources has announced the first gas delivery from its Mnazi Bay Concession in southern Tanzania to the country’s new transnational pipeline. Two wells are now producing, with the three remaining wells expected to be put in production in the coming months. Initial production volumes will be used for
Read More
PT Pertamina Gas is accelerating the construction of the 267-kilometers of gas pipeline linking Gresik town in East Java and Semarang in Central Java, known as Gresem pipeline. The gas pipeline will help connect gas pipeline across the Java Island.
President Director of PT Pertamina Gas (Pertagas) Hendra Jaya said since the delivery of pipelines to
Read More
PT Pertamina Gas (Pertagas), a subsidiary of state owned oil and gas company PT Pertamina, has kicked off the construction of Porong-Grati gas pipeline, with a length of 56 kilometers in East Java.
Pertagas President Director Hendra Jaya said the groundbreaking of the Porong-Grati project was aimed to meet the gas needs of PLN power plant.
Read More